Consultancy Projects (Industrial research)

Sl No Details of completed Consultancy Projects Period
1 Design & Evaluation of Lightning Protection Scheme for Second Launch Pad at Sriharikota ISRO
2 Estimation of post-stroke potential distribution at some critical regions of PSLV/GSLV launch pad ISRO
3 Evaluation of Lightning & over voltage protection of C-Dot’s HVP cards used in RAX/MAX subscriber Lines in digital telephone exchanges for M/s Centre for Development of Telematics, CDOT, Bangalore, India. April-July 2009
4 Experimental Investigation on the Corona performance of a 765kV Synthetic Insulator String with two types of CC rings & Technical advice for M/s SIEMENS Ltd,  Gurgaon, India. Nov/Dec 2009
5 High Voltage performance tests on Conduit Assembly (fuel pipes) used for LCA for M/s Hindustan Aeronautics Ltd Bangalore, India. Sep-10
6 Experimental investigations & Technical advice on performance of 400 kV High temperature high current low sag conductor accessories and semi-strain string assembly for M/s Preformed Line Products (Thailand) Ltd, Bangkok-Thailand. Feb -March 2011
7 Developmental tests on 765 kV ACSR Zebra Hexagonal bundle conductor configuration string for M/s Anam Electrical Manufacturing Company, Kadiyam – East Godavari, India. 01-03-2011
8 Advice and validation on evaluation of the 400 kV stress in polymeric insulators (project carried out by APDAP for Bharat Heavy Electricals Limited, Bangalore, India). 2010-2011  & 2013
9 *Design of Corona Control Rings for India’s first 800 kV Fixed Series Compensation Platform and Equipments on the platform (project carried out for Siemens India). Dec-10
10 Discussion and advice on computational electromagnetic for GE India Technology Center, Bangalore, India. Jan-11
11 Guidance on realizing magnetic rotation of longitudinal high current DC arc and its splitting for High Enthalpy Facility, VSSC, ISRO completed
12 Electrical modelling of LCA Mk 2  (Development of codes for lightning protection design of fighter aircrafts) Initiated on Nov 2015
14 Short circuit forces and the dynamic response of bent bus section of a 400 kV switchyard, Sponsored by Siemens. Completed in 2015
14 Review of design philosophy adopted for earth mats at substations of BMRCL Completed in Dec 2016
15 Review of the existing design and its possible optimization for earthing systems and lightning protection system for DMRC stations and substations, funded by DMRCL. Completed
16 Suitable Lightning Protection Scheme for Radome of a Modern Aircraft Completed
17 Detailed Study on the Lightning Interception Efficacy of the Existing Lightning Protection Scheme for the Modified Launch Pad-II  (first part of the study) Completed
18 Lightning and Surge Protection to Signalling equipment funded by RDSO Initiated in 2022